We supply electric underfloor heating for homes that are already built, where there is no pour to catch and the slab is already down. Height is the limit instead, because the finished floor can only rise so far before the doors stop closing. Under tile heating mats add little to the finished height, while in screed heating cable adds a good deal more. Our installation area is Sydney, surrounding NSW and Canberra, subject to checking installer availability. We quote a renovation from the floor plans of the rooms you are doing.

A heating mat rolled out over the existing floor of a finished room, with the curtains and windows still in place.

Heating mats over an existing floor

We recommend under tile heating mats once a floor is already down, because they ask the least of the finished height. The under tile heating mats we supply are 3mm thick and put out 200W per square metre of heated floor. The contractor lays them onto the prepared floor and your tiler beds them in with at least 5mm of adhesive. On a floor that could take more height, a 30mm screed over them holds heat better, because the extra mass does the holding. Under tile heating mats suit a room of regular shape, where a rectangle of pre spaced cable covers most of the floor in one go. Around a curved wall or a run of fixtures the mesh is cut and the freed cable woven through. The heating cable in it is never cut. Either way the covering above it is new, so we go in before the tiling.

  • 200W per square metre
  • 3mm thick
  • Adds least to the finished height
  • Mesh cut to weave around curves
  • Goes down before the new tiling
  • Suits a room you are re tiling
Heating cable set out across the floor of a room stripped back to its brickwork during a renovation.

In screed heating cable in a gutted room

In screed heating cable is laid onto the floor, and your tiler covers it with at least 30mm of cement screed. That is real height on a floor already down, so it is out of reach of a room you are only re tiling. We recommend it where a room has already come back to the slab, or where the floor is being levelled again anyway. The heating cable itself is 30W per linear metre, laid at 150mm spacing. Once we have fixed it down your tiler takes over, and the floor finish goes on top of the screed. The room is out of use for longer, because the screed has to dry before anything is laid on it.

  • 30W per linear metre
  • Laid at 150mm spacing
  • At least 30mm of cement screed
  • For a room stripped back to the slab
  • Heating cable fixed down before the screed
  • Suits a kitchen or living area rebuild
Heating cable fixed to the reinforcing mesh of a new extension slab, with the formwork still in place.

In slab heating cable in a new extension slab

We treat an extension pour as the only chance a renovation gets at in slab heating cable. The dual core cable we supply is 30W per linear metre and goes in at 150mm spacing, tied to the slab mesh. The contractor sets it onto the mesh before your concreter pours, while the rooms you are renovating take under tile heating mats at tiling stage. That is one job carrying two different systems, and we quote and programme both of them together. Your builder's slab date sets the start date, so it is the part of the heating that has to be settled earliest.

  • For an extension that gets its own slab
  • Existing rooms take heating mats at tiling
  • Two systems, one quote
  • Booked around the builder's slab date
  • Heating cable and heating mats ordered together
  • The slab installation sets the start date.

Common renovation situations

The floor is coming up anyway

The contractor lays heating onto a floor that is already being stripped, which is then cleaned and levelled.

The kitchen or living area is gutted

We put heating into a room stripped back to the slab, where the floor can rise far enough to carry a screed system.

We are adding an extension

The contractor sets in slab heating cable onto the new extension slab and lays under tile heating mats through the rooms you are renovating.

We want a price before booking anyone in

We work a renovation quote out from the floor plans you send, so nobody has to walk through the house first.

What a renovation job involves

The height available decides the system

We work to the floor levels you already have, because a renovation cannot set them the way a new build does. Under tile heating mats are the thinnest of the three systems and in screed heating cable is the thickest. That difference in finished height is usually what decides between them.

One new circuit, not a new switchboard

One new circuit is required to a house that already has power, and that is the whole of it. It is not a rewire and it is not a new board. Your lights, your power points and your appliances stay on the circuits they are already on.

The old board is barely touched

The circuit breaker or the contactor is fitted into a plastic housing that is already on an older switchboard. The board itself is barely disturbed, which matters in a house where it is still the original one. Nobody wants an old board opened up further than the work actually needs.

How long we are in the house

The contractor roughs in and fits off one heating cable in a same day visit. An entire four bedroom house takes us 1 to 2 days. One installer lays about 50m² of heating cable in a day, which is what sets both figures. Those are our days on site rather than the length of the renovation. The tiler and the floor layer each set their own waits around us.

Call 02 9829 2752

Get a free quote

Tell us what is happening and we will get back to you with a price as soon as we can. There is no obligation to go ahead.

Service available across every Sydney region

Inner West and the city

Burwood, Canada Bay, Inner West, Strathfield and Sydney CBD

Eastern suburbs

Randwick, Waverley and Woollahra

St George and the Sutherland Shire

Bayside, Georges River and Sutherland Shire

North Shore and Northern Beaches

Hornsby, Hunters Hill, Ku-ring-gai, Lane Cove, Mosman, North Sydney, Northern Beaches, Ryde and Willoughby

Western Sydney

Blacktown, Blue Mountains, Cumberland, Hawkesbury, Parramatta, Penrith and The Hills

South Western Sydney

Camden, Campbelltown, Canterbury Bankstown, Fairfield, Liverpool and Wollondilly

Outside Sydney

Canberra, Central Coast, Goulburn, Shoalhaven, Southern Highlands and Wollongong

Frequently asked questions

Do you need to come out before you can quote a renovation?

No. We quote underfloor heating for renovations across Sydney, surrounding NSW and Canberra from floor plans rather than from a site visit. Send floor plans of the rooms and the existing floor, along with a site plan if you have one. We ask for photographs afterwards if anything on the plan is not clear. We work out the heated areas and the cable size from those. Installation across that area is always subject to checking installer availability first.

Will our floors end up higher than they are now?

Yes. A renovation floor does end up slightly higher, and how much depends on the system. A heating mat sits in the tile bed and lifts the finished floor a little. An in screed system has to sit in at least 30mm of cement screed, so it lifts the floor a good deal more. We work out how much before quoting, so a door that will not clear the new floor is found on paper.

Can we heat only some of the rooms?

Yes, and most renovations do. The heating is sized from the rooms you choose rather than the whole floor. A bathroom and an ensuite can be heated while the bedrooms are not. Each heated area runs on its own thermostat, so rooms used at different times are not forced onto one schedule. Tell us which rooms when you send the plans.

Does the old floor covering have to come up?

Yes. Underfloor heating goes under the floor covering, so the old tiles, boards or vinyl have to come off before it can be laid. That is why a renovation is the moment to do it, because the covering is already coming up for other reasons. The floor also has to be prepared and ready on the day of installation, and that preparation is arranged by you or your builder.

Can a new extension and the existing rooms both be heated?

Yes, and they take different systems. The extension slab takes in slab heating cable, which has to go in before the pour. The rooms you are renovating take under tile heating mats at tiling, which is usually weeks later. One quote covers both, but the slab date is the fixed one and the rest works around it.

Is insulation board included?

No. Insulation board is not part of a standard installation, so nothing in a quote assumes it. It can help on a timber floor or over an unheated space below, because it sends more of the heat upwards instead of down. If you want it, say so when you send the plans and it is quoted separately.